Full legislation
s.47
Initial determination of maximum permissible working pressure of boilers and pressure vessels
Where a new boiler or pressure vessel is being examined for the purposes of section 24 , an appointed examiner shall determine the maximum permissible working pressure at which, in his opinion, the boiler or pressure vessel, as the case may be, may be operated. (Replaced 67 of 1978 s. 23 )