Documents to be delivered to Authority in respect of new boilers and pressure vessels

The owner of a new boiler or pressure vessel, other than a pressurized fuel container, shall, not less than 30 days before the day on which he intends to put the boiler or pressure vessel into use, deliver to the
Authority—
(a)
one copy of the maker’s certificate and one copy of the certificate of inspection during construction issued in respect of the boiler or pressure vessel by a recognized inspection body; or
(b)
documentary evidence, to the satisfaction of the Authority, that the boiler or pressure vessel complies with a recognized engineering standard or code in respect
of—
(i)
the welders employed and welding procedures used in the construction and erection of and, if repairs have been carried out, in the repairs to, the boiler or pressure vessel;
(ii)
heat treatment before and after welding;
(iii)
tests and inspections carried out on the boiler or pressure vessel; and
(iv)
any other relevant technical details that the Authority may, by notice in writing, specify; or
(c)
where the owner can deliver neither the documents referred to
in paragraph (a) nor the documents referred to in paragraph (b), details of the design and methods of construction, inspection and testing of the boiler or pressure vessel and its auxiliary equipment.