Full legislation
s.31
Periodic examination of pressurized fuel containers
(1) Every existing pressurized fuel container shall be examined by an appointed examiner within 12 months after the commencement of this section. (2) Every new pressurized fuel container shall be examined by an appointed examiner within 12 months after the date on which it is first put into use. (3) Save as provided in subsections (1) and (2), every pressurized fuel container shall be examined by an appointed examiner within 12 months after the date marked thereon in accordance with this Ordinance as the date on which the last examination thereof was completed.