Cap. 56activeordinance

Boilers and Pressure Vessels Ordinance

鍋爐及壓力容器條例

Full legislation

s.(2A)

(2A)

(2A)
Where—
(a)
the Authority is satisfied that a boiler or pressure vessel cannot, because of operational requirements, be shut down for an examination required by subsection (1); and
(b)
an appointed examiner has examined the boiler or pressure vessel while operating and is satisfied that it could continue to operate safely beyond the period within which the boiler or pressure vessel must be examined under subsection (1),
the Authority may, by notice in writing to the owner, extend that period for
                not
                more than 6 months and, if he does so, the relevant certificate of fitness shall
                remain in force until the end of that extended period.
(Added
87 of 1988 s. 13
)