Where—
(a)
the Authority is satisfied that a boiler or pressure vessel cannot, because of operational requirements, be shut down for an examination required by subsection (1); and
(b)
an appointed examiner has examined the boiler or pressure vessel while operating and is satisfied that it could continue to operate safely beyond the period within which the boiler or pressure vessel must be examined under subsection (1),
the Authority may, by notice in writing to the owner, extend that period for
not
more than 6 months and, if he does so, the relevant certificate of fitness shall
remain in force until the end of that extended period.