ONSTRUCTION AND ARBITRATION PROCEEDINGS NO. 49 OF 2002
(1) At page 22, paragraph 74, after item (13) add the following:
“(14) Agreed variations 517,018”
(2) At page 22, paragraph 74, line P, the sum “7,592,858” should read “8,109,876”.
(3) At page 35, paragraph 115, line S, the figure “$6,843,309” should read “$7,360,327”.
(4) At page 35, paragraph 115, line T, the date “21 June 2001” should read “2 June 2001”.
(5) At page 36, paragraph 115, line B, the figure “$2,571,583” should read “$2,764,659.81”.
(6) At page 36, paragraph 115, line C, the figure “$1,687” should read “$1,764.46”.